Sunday, April 10, 2022
Dry dock
Lille Ø was lifted to the hard for the weekend in preparation for this summer’s cruise. A hectic period followed, with a full winter’s workload compressed into just a few days.
The TODO list:
- Wash boat
- Wax boat
- New antifouling
- Wash mast
- Lubricate mast rollers
- Rigging check
- Replace broken mast sheave
- Install new jib halyard
- Re-route spi halyard
- Propeller maintenance
- Install solar arch
- Replace toilet sink seacock
- Check all seacocks
- Change all positional lights to warm white leds
- Check rudder attachments for wear and tear
- Profurl maintenance
There are still some smaller things to do that can be done in the water. And of course provisioning.
- Distance during weekend: 120 000 steps
- Elevation: 57 floors