Buy us a beer!

Saturday, August 21, 2021

Szczecin - Swinoujscie

We moved the boat to the mast crane at 7:30, and by 8:20 the mast was up and we were able to start tuning the rig and preparing the sails. This was also an opportunity to do some light provisioning, even though the grocery store was quite a walk away. We also utilized the local chandlery to get some spare parts for our navigational lights. At 11:32 we left the marina and started crossing the shallow waters of the Dabie towards the sea.

Motoring

At 13:38 we installed new waterproof connectors for the steaming and anchor lights. Pretty exciting to do electric work on deck whole under way. We also installed the wiring and the NMEA 2000 connector for our new ultrasonic wind sensor. Arrival to the Swinoujscie marina at 19:08. The marina was totally packed due to a harbour festival, and we ended up side-tying the boat to a Dutch steel schooner.

Rafted up



From the logbook

Time Position Course Speed Log Weather Remarks
21.08. 6:40 Z n/a Leaving box for mast crane
21.08. 7:20 Z n/a Back in the box, mast up, preparing boat and shopping
21.08. 10:32 Z n/a Leaving Stettin
21.08. 12:38 Z n/a Installed new connectors for anchor + motor lights under way
21.08. 18:08 Z n/a Arrived Swinoujscie, side tied with steel schooner Ice Bear on town dock